'黄陵电厂储灰场大坝施工组织设计1
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂贮灰场施工组织设计编制:审核:审批:编制时间:2
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。目录第一章编制依据及原则·············································2第1节编制依据················································2第2节编制原则·················································2第二章工程概况及地质·············································3第1节工程概况················································3第2节地质资料······································`·········4第三章施工总体部3
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。署················································6第1节施工组织管理机构······································6第2节施工原则·················································8第3节工程总目标··············································8第4节生产要素投入···········································9第四章施工准备····················································10第1节施工技术准备··········································10第2节现场准4
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。备···············································11第五章主要施工方法及技术措施·································12第1节施工测量放线··········································12第2节分部工程施工··········································13第六章质量保证措施···············································27第1节工程质量目标··········································27第2节质量控制和保障的指导原则··························27第3节机构设立···························5
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。····················27第4节保证工程质量的组织措施·····························28第5节保证工程质量的技术措施·····························29第七章安全生产技术措施·········································30第1节安全生产目标··········································30第2节安全管理网络图·······································31第3节安全管理制度··········································31第4节安全生产教育···························6
资料内容仅供参考,如有不当或者侵权,请联系本人改正或者删除。···············32第5节落实安全技术措施····································33第6节建立安全检查制度····································33第八章安全用电措施···············································33第九章文明施工措施···············································34第十章环境保护措施···············································35第十一章工期保证措施············································35第十二章雨季施工措施···························7
'
您可能关注的文档
- 水型大坝施工组织设计
- 某水库碾压-混凝土大坝施工组织方案(参考~)
- 大坝施工组织方案
- 【9A文】尾矿库大坝施工组织设计
- 某水库碾压混凝土大坝施工组织设计方案(参考)
- 某重力坝水库大坝施工组织设计范本.doc
- 青铜峡大坝施工组织设计.doc
- 尾矿库大坝施工组织设计(1).doc
- 大坝施工组织设计.doc
- 尾矿库大坝施工组织设计(一)
- 市政道路、排水工程施工组织设计方案.doc
- 市政道路及排水工程施工组织设计.doc
- 宁夏石嘴山市隆湖小区给水排水工程施工组织设计毕业论文.docx
- 市政道路、排水工程施工组织设计方案
- 工业物流园区商业街道路及给排水工程施工组织设计
- 城建滑翔七小区道路、室外排水工程施工组织设计施工组织设计
- 医药工业园道路工程路基土石方、路面及排水工程施工方案
- 建筑给排水工程施工监理研究硕士研究生论文